|
Central West Transport Needs Study
Central West Transport Needs Study Summary [ PDF: 2324 KB]
Central West Transport Needs Study Final Report [ PDF: 17841 KB]
Lower Hunter Transport Needs Study
Executive Summary and Report [ PDF: 7076 KB]
Environment Evaluation of the Road Route Options [ PDF: 9034 KB]
Independent Review of the Cost Estimate for the F3 to Branxton Proposal [ PDF: 6273 KB]
Freight Transport [ PDF: 2736 KB]
Public Transort Initiatives [ PDF: 3658 KB]
Traffic Analysis [ PDF: 7659 KB]
Strategic Engineering, Costing and Staging [ PDF: 15404 KB]
Evaluation Appraisal [ PDF: 6612 KB]
Addendum 1 - Black Hill Bypass [ PDF: 9973 KB]
Stakeholder Engagement [ PDF: 7942 KB]
Note: The appendixes for Technical Paper 1 have not been published on the website, these are available on request from the Department.
Toowoomba Bypass
Toowoomba Bypass Project Business Case [ PDF: 1110 KB]
Toowoomba Bypass Project Business Case Executive Summary [ PDF: 71 KB]
Toowoomba Bypass Media Release
Corridor Studies
North-South Rail Corridor Study
Black Spot Project Information Reports
|
PDF: In order to download or print PDF versions of documents, you need to have Adobe Reader installed. If you don't have Adobe Reader installed, download the installer from the Adobe Reader web page and then install the Reader before continuing.
|
|
Disclaimer: The compatible application(s) listed above are examples
only. The Department does not endorse any particular software developer or specific
application.
|